Proven Results Across Diverse Projects

Pacific Galvanizing has partnered with fabricators, contractors, and manufacturers throughout the Bay Area to deliver high-quality, long-lasting galvanizing solutions. 

Bay Bridge Bike Lane Guardrail, Oakland Ca

Pacific Galvanizing galvanizing for the railing along the bike path on the Eastern span of the Oakland-San Francisco Bay Bridge.Galvanizing was chosen to minimize lifetime maintenance costs in this highly corrosive environment.

Santa Rosa School displaying Hot Dip Galvanizing from Pacific Galvanizing in Oakland
Piner High School, Santa Rosa Ca

Pacific Galvanizing provided galvanizing on structural components for the Piner High School geospatial building.

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
The Park, Alameda Ca

Galvanizing was selected for exterior cladding and railings as a low maintenance, low lifecycle cost corrosion protection for this 62 unit apartment building.

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
Data Center, San Jose Ca

Galvanizing was utilized in this large data center for exterior steel and the additional roof infostructure required to support support additional HVAC loads. Galvanizing reduces lifetime maintenance required for the facility, allowing for more equipment uptime.

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
"Loqui" Sculpture, Nashville Tennessee

Pacific Galvanizing provided galvanizing for the frame of this large sculpture at the Nashville Tennessee fairgrounds. We were able to work with the fabricator to creatively add drain holes in a way that did not disrupt the piece.
Artist credit: Blessing Hancock
Photo Credit: Gizmo Art Production

Pacific Galvanizing Portfolio Project, hot dip galvanizing California Statue
"Loqui" Sculpture, Nashville Tennessee

Pacific Galvanizing provided galvanizing for the frame of this large sculpture at the Nashville Tennessee fairgrounds. We were able to work with the fabricator to creatively add drain holes in a way that did not disrupt the piece.
Artist credit: Blessing Hancock
Photo Credit: Metro Arts Nashville

Warm Springs BART, Fremont, Ca (Contributing Galvanizer)

Pacific Galvanizing provided portions of the galvanizing work for the Warm Springs extension station. Galvanizing was utilized as a low-lifetime maintenance cost solution.

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
The Mill on Brown, Lafayette Ca

Pacific Galvanizing provided services for this luxury 13 unit townhome project.Exterior railings, enclosures, and posts were galvanized to provide a long lasting and low lifecycle cost corrosion protection.

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
BART station Art Instillation, Oakland Ca

BART selected hot dip galvanizing to protect this art instillation in West Oakland.Galvanizing provided a low life cycle cost inline with BARTS budget.Pacific Galvanizing was able to collaborate with the artist during fabrication to ensure a high quality final product.

Hot Dip Galvanized Solar Canopies Car Park
Solar Canopies, Antioch Ca

Antioch Unified School District's focus on sustainable practices saw instillation of solar canopies across districts campus's.Pacific Galvanizing provided services for canopies, ensuring no ongoing maintenance costs during the solar panel lifetime.

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
Sculpture (6' height) , Bay Area Ca

Pacific Galvanizing received the Excellence in Hot Dip Galvanizing award for our work on this piece.
Pacific Galvanizing worked with the artist to add venting and drainage holes in the least intrusive way possible.
photo credit: Benjamin Williams

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
MSVA, Mountain View CA

Pacific Galvanizing provided services on exterior components of this 632 unit residential building.
Galvanizing was selected as a low-cost lifecycle maintenance solution.

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
Nasa Ames Research Center, Mountain View Ca

Pacific Galvanizing was a contributing galvanizer during the rehabilitation of the world's largest wind tunnel in the 1980's.

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
Parking Garage, San Francisco, Ca

Pacific Galvanizing provided galvanizing for exterior exposed steel supports for the cladding of this over 800 spot parking garage.

Bike Racks for Chair Lifts, Big Bear Mountain, Big Bear Lake, Ca

During the summer months, Big Bear Mountain Resort converts some of its chair lift seats to bike racks to take mountain bikes up the mountain.
Hot Dip Galvanizing was chosen because of the low-cost lifetime protection for these custom-built racks.
photo credit: www.bigbearmountainresort.com

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
MSVA, Mountain View CA

Pacific Galvanizing provided services on exterior components of this 632 unit residential building.
Galvanizing was selected as a low-cost lifecycle maintenance solution.

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
Golden Gate Bridge Suicide Prevention Net, San Francisco Ca (Contributing Galvanizer)

Hot Dip Galvanizing was specified for structural components of the suicide prevention netting retrofit. The extremely corrosive environment spanning the San Francisco Bay required maximum corrosion resistance.
Pacific Galvanizing provided service for some of the components on the project, all to meet or exceed stringent CalTrans certification.

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
Kaiser Medical Center, Oakland Ca

Pacific Galvanizing provided the majority of galvanizing work on the Kaiser Medical Center in Oakland, Ca.
Pacific Galvanizing worked closely with the fabricator and architects to galvanize unconventionally shaped structures.

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
Pleasant Hill Public Library, Pleasant Hill Ca

Galvanizing was specified to provide low lifetime maintenance costs for the new $24 million dollar library.
Exterior enclosures, railings, and supports were galvanized.

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
Tillery, Mountain View Ca

Galvanizing was utilized for exterior steel on this 5 story 226 unit residential building.
Predictable maintenance costs allow for maximum project cash flow.

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
Sculpture, Bay Area Ca

Pacific Galvanizing works with this local artist, who's cat sculptures can be seen at many Bay Area events and venues.
Pacific Galvanizing was able to work with the artist early in the process to ensure the result met the artist's needs.

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
Flagpole, Jack London Square, Oakland Ca

Pacific Galvanizing donated services for the iconic flagpole at this Oakland retail center. The pole has been exposed to bay salt for over 40 years and has required little maintenance.

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
Berkley Unified School District, Berkley Ca

Galvanizing was utilized on the utilized Berkley High School Stadium Building to reduce lifetime maintenance costs for the facility upgrade.

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
Children's Day School San Francisco Ca
Pacific Galvanizing Portfolio Project, hot dip galvanizing California
Oakland Airport Flood Prevention Project, Oakland Ca

As a part of the $30 million dollar flood prevention program, hot dip galvanizing was utilized on ferrous surfaces.
The Bay environment is highly corrosive and galvanizing was specified to provide the most cost effective and lowest maintenance cycle solution.

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
Staduim, Napa Ca

Pacific Galvanizing was a contributing galvanizer for the exterior exposed steel to provide efficient and cost effective corrosion protection.

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
Synagogue, Tuburon, Ca

Pacific Galvanizing provided services for the exterior canopy and other exterior structures of this historic Bay Area Synagogues remodel project.
Hot Dip was selected as it provided the lowest life cycle maintenance cost.

Pacific Galvanizing Portfolio Project, hot dip galvanizing California
Parking Garage, Sacramento Ca

Hot Dip galvanizing was used to protect the exposed steel in this multi-story parking garage.
Hot dip was selected to provide durability and limited maintenance to allow for maximum utilization of the structure.

Apple Park, Cupertino Ca, Contributing Galvanizer

Pacific Galvanizing provided services on parts of Apple's Cupertino building.